BIM Coordination, BIM Process Management

Hospital Jessa à Hasselt

Jessa hospital in Hasselt

This is a new construction project for Jessa Hospital in Hasselt. Approximately 135,000 m², plus parking, with a construction budget of +/- €267 million.

The new unified campus will be located in the center of the Salvator Plus site and will house the three current healthcare campuses (Virga Jessa campus, Salvator campus, and Sint-Ursula campus). To limit the spatial footprint, an 18-story “Park Tower” will be built. This part of the building is intended for patients who are only admitted to the hospital for a short period of time. In addition, there will be a lower ‘Park Wing’, interwoven with the green park environment, for patients who need to be in hospital for longer periods or frequently (such as psychiatry, rehabilitation or dialysis and part of geriatrics). The consultation and outpatient care services will also be housed in this wing. The interaction with the green park plays a crucial role for the users of this park wing. This green lung in the city is not only accessible to patients and visitors but also to the residents of Hasselt. Medical-technical services, such as medical imaging, intensive care, operating rooms, emergency services, etc., are located in the ‘Foot of the Tower’. The Hub forms the logistical heart of the campus, with the warehouse, central kitchen, pharmacy, and clean room. The Hub is connected to the rest of the building above and under ground.

challenges

bim methodology

The implementation of BIM in projects requires a specific approach. Our BIM team has extensive expertise and experience in Belgian and European projects with international players. D-studio acts as BIM and information manager and BIM coordinator for project organizations or as BIM consultant for companies. We are always guided by international standards and best practices, but tailor them to the project and the parties involved. Our strengths:

  • BIM management projects since 2012, > 10 years,
  • Meer dan 50 projecten met een budget boven de 10 milj, en meer dan 15 met een bouwbudget boven de 100 milj,
  • Internationale projecten, in Nederland, Duitsland, Frankrijk, Luxemburg en Zwitserland,
  • 1e project voor de EIB (Europese Investeringsbank) in Luxemburg in 2014,
  • Een team van bouwprofessionals (ingenieurs/architecten/aannemers),
  • More than 50 projects with a budget exceeding €10 million, and more than 15 with a construction budget exceeding €100 million.
  • International projects in the Netherlands, Germany, France, Luxembourg, and Switzerland.
  • First project for the EIB (European Investment Bank) in Luxembourg in 2014.
  • A team of construction professionals (engineers/architects/contractors).

descrpition Role d-stuido

D-studio carries out a full BIM Management mission throughout the entire project cycle and partial BIM coordination mission on behalf of TM Osar – Robbrecht en Daem.

In accordance with the Belgian BIM standards and ISO 19650, such as:

  • BIM strategy and maturity analysis
  • BIM Protocol and EIR definition
  • BIM Implementation Plan for the study phase
  • Follow-up on spatial coordination, clash detection, and health checks (study phase)
  • Validation and verification of models during the implementation phase via health checks and limited clash detection (follow-up by implementation team)
  • Definition of BIM operation in consultation with the client
  • Definition of as-built model
  • CDE management

Project in beeld

MORE INFORMATION

RADU DORDEA
rd@dstudio.be

Bekijk ook onze andere projecten

Projecten

UZB

BIM Process Management

Quartz

BIM Process Management

Delft railroad station – The Netherlands

BIM Process Management

ZIN-Belpairegebouw

BIM Coordination